Showing posts with label MTB. Show all posts
Showing posts with label MTB. Show all posts

Tuesday, 12 August 2014

Lost visions of the 1980s: don't just blame sustrans

The post about the Lost Cycling Visions of the 1980s generated a fair few tweets faulting Sustrans.

Its not fair to blame them for the state of the UK's cycling infrastructure.

Blame them for

  1. Acquiescing to councils that want anti-cycling barriers on routes
  2. Acquiescing to councils that want gravel paths
  3. Approving the bedford turbo roundabout —and continuing to do so.
  4. Producing a set of design guidelines in 2014 that are truly dire
  5. Approving of the London Quietways
But don't berate them for building paths where they could. The real issue is: they didn't get to build paths where people are.

Why not?
  1. Lack of political will
  2. Space in towns considered too valuable for housing and other uses. Indeed, the Bristol-Bath path only got through the late 80s/early 90s precisely because those tram-assessed civil engineers in Avon County Council wanted it retained for their plans.
And why the lack of political will? Not enough people being noisy, and not enough clarity over what they wanted.

If you want someone to blame, and you cycled in the 20th century you know who to blame. Go and stand in a mirror. With your mountain bike.

Mountain Biking may be fun, but it's a sport, not a transport. The early MTBs may have taken mudguards and racks, and offered a sit-up position, but they evolved into suspension toys that are utterly unsuited to most commuting runs. Or at least, they would be in the NL. In the UK they can cope with the dropoffs that paths have, the gravel stretches, the bits where you have to brake hard and veer over in a different direction. People adopted bicycles that worked around the awfulness of UK cycle paths —and called it fun. And the mass market went with them, so hybrid bikes with heavy and mediocre front suspension are common. These are bikes that don't take mudguards, yet sold in the UK as urban, sold at a price that includes those awful coil-sprung forks that do nothing but increase weight. Even worse, the bike-shaped-objects often go for Unified Rear Triangle suspension —who hasn't despaired at the sight of a six year old on solid steel URT bike with a coil rear shock that even  a dedicated DHer would find overweight.

By embracing mountain biking as everyday transport, a large proportion of the UK cycling community effectively got out of caring about the quality of those cycle tracks that did get built.

As for you in the mirror: where were you? Did you accept what was given? Did you believe that the government and councils were going to make things better? Did you rely on others to be the campaigners —and did you know what they were asking for in your name?

Not sustrans then: you. 

Never mind.

Sustrans have to redeem themselves now by focusing on what they are good at: engineering, and pushing back on things that don't work: niceway codes, roundabouts with two-tier provisions that suck for both tiers, barriers on the paths, gravel. They need to recognise that their original goal, was what that 1985 book cited: paths that children, the elderly and families can all be happy using. Only: these paths must be in cities and alongside A-roads, not just somewhere quaint in mid-wales. Because while the NCN82 may be a lovely leisure route, it's not a commuter route. 

And for the people looking in the mirror, feeling slightly guilty over their inaction? It's not too late.

Freewheeler showed us all how dire everything really was; Hembrow an Mikael show how things can be different. tools like twitter help people find each other.

Just like Sustrans, we need to recognise what we want, and shout for it —together




Tuesday, 27 December 2011

Half-arsed, but better than TfL's work.

In a break from the whining, here's an Xmas gift, the route to St Werburgh's. This is good quality, though missing a few features that would prevent it being used as much as you'd think. Little things like lighting and signage.

This is a video of the descent from UWE to St Werburghs, following the official path with a few mountain bike options exercised. After all, the quality and intermittentness of the S Gloucs paths do effectively mandate mountain bikes with good travel on the front forks and -ideally- disk brakes. If you have the transport needed to negotiate bike paths whose entry and exits go over undropped kerbs, paths with 50cm dropoffs where the paths meet, etc, then you may as well make the most of it and have some fun.

Anyone who depends on TfL for their cycle safety will stare at this video and say "we wish we could have something this good", but the dutch will look at it and say "Could our children get to school on this?".




This video was taken in October, just as the sun was starting to set during the evening peak commute times. Once the clock changed, this went all dark and even on foot you'd worry about the underpass beneath the M32. You'd also stop using the fishponds roundabout underpasses and use the road crossings. Which, in their favour, are there at all: those over the M32 entry/exit points are recent. Until a year ago there was a sign saying "three pedestrians have died crossing here -use the underpass". Now there is an overground option that is survivable, even if you have to wait a minute or two.

Speaking of underpasses, the stairs are optional. You can go down the slope, though it's a bit skittery when the autumn leaves are there. A direct descent of the (shorter) steps avoids the corner and the traction on a 45 degree flight of steps is consistently bad in all weather.

Once you cross the roundabout you get into the 20 mph zone, with speed bumps to enforce deceleration. Heading out, the pavement is a shared use route, heading in you can grab the lane and head down it before scooting right. Then comes the final stretch to the St Werburgh's bridge, up over that and it's in to St Werburghs. UWE to the city, in under 14 minutes, with minimal risks, at least during daylight hours.

Most of this route is under the control of the Bristol Council cycle team. The good features: the 20mph zone, the give-way crossings, the new bike/pedestrian crossings at the roundabout, the frome valley path are all their work. Presumably the stretch through stoke park is theirs too.

In what is clearly the S Gloucs stretch at the beginning, you can see their official bike path features. Crossings and barriers. No signage saying "city centre 15 minutes".

And all the way along: no lighting. You would be fairly bold to do this on foot or bike on your own.

The biggest irritant is that stretch of road. It's a wide road with minimal parking pressure. Why didn't they put a segregated bike path along here, with some formal crossing at the roundabout? Do that with some lights and you do have a safe path that the kids could use.

The other issue is that the M32 bridge can't sustain heavy bicycle traffic. Two bicycles cannot pass on the corners, and visibility as you approach those bends, especially uphill, is pretty bad. If the volume of cycling traffic increases, this bridge could become a choke point. This would be an opportunity to put in access routes that are wider, and add some lighting at the same time.

Friday, 4 March 2011

No, we think the Dutch would still laugh

Part of the feedback from our coverage of the new "technical" bike path going up  was that we "didn't know the plan", and that to say the dropoff was going to be a disaster was slander.

Well, this week the fencing is all down, and the dropoff has been enhanced by a slope. As Frank told us last week "There is a fence across the cycleway showing it is not in use you blind git.". The absence of a fence must mean it is now open for use. Presumably the contractor will now notify S Gloucs council that whoever is putting up this path is ready for the bollards and the pillars to go in.


Another (deleted but in our archives) message said
Why should something which is not fucked up be repaired.

I pity your clients even when told your in the wrong you cannot see the solution.
Well. as we predicted, the solution coming from the road builders, -the romans- tries to resolve the 50 cm height difference in 1.5m horizontal, leading to a 33-50% gradient or thereabouts, just where it joins the cross route which is a popular walking/cycling route to the university.

This will be impossible for happy families to ride up
-and positively dangerous on the DH, on account of the cross traffic. That's even if you have -like anyone who has to cycle round this area needs- an MTB with good travel and fat tyres.

We have now attempted the descent, here is the video from the evening

As an experiment our rider did ride through the junction, having to carve right fast to avoid the vegetation, while retaining enough speed to avoid having the existing cyclist clip us. No braking until off the drop; didn't want to damage the earthwork. Look at the lights on the ground to track the placement of our rider and the other cyclist coming from the side and being forced to swing right to get past our successful attempt to descend without doing any tree-work.

Now, we were also told, "with your poor design perception and blinkered approach I am not suprised" for our criticism of the design. Well, we have been there, we have tested it. It doesn't work. If you put a layer of tarmac over the slope, it still won't work -it just makes it easier to brake as you descend. Most cycle path users will be unable to get up the slope, and as we've just shown, even commuters with 100mm of front travel and good brakes can't descend in control.

Frank, if you are in this project, and this was "your solution", we are sorry. It isn't a solution. It is, to use your own phrase "fucked up". A gentle gradient to the junction is a solution - replacing the step with a steep slope isn't. Please try cycling it and you will see.


Citizens of South Gloucestershire! Once the slope is metalled we are planning a mountain bike event here! It'll be a lunchtime friendly event with categories
  • Best manual/jump off it
  • 2x2 uphill challenge
  • Circuits
Adult MTB, CX and BMX only, too tricky for the fixies. Unless they are brave, in which case they can play too.

Sunday, 27 February 2011

Counter Revolutionaries!

The complaint that we have made slanderous claims about the forthcoming new cycle path that almost-but-not-quite joins up with the UWE-Lockeaze path have led to a new web site being created: The South Gloucestershire Cycling Front . That's good, though not quite in keeping with the Monty Python Theme. Please, go watch the Life of Brian again and add popular or people's to the title somewhere.

It appears that this site was put up by the person David/Frank who was upset about our coverage of the new cycle path. In the identity "Frank Spencer" - a tribute to the 1970s comedian who was not involved with the Monty Python group (again, pity: Brian would have been a funnier fake name. Or Bwian :), we are denounced by these people who do not want our vision "Bike Paths the Dutch don't laugh at" realised




 
Here are some answers to their questions

Is the South Gloucestershire Cycling Front run by a failed engineer?

-No, we are a group of users who are fed up with the mediocre routes we have. They are there, they could work, but not the way they are going. You get something without lights, bollards and pillars are being added and every that path abandons you at roundabouts. And there are so many roundabouts here.

Why does this idiot think he can do better than everyone else.

We have been abroad, we know what can be done, we recognise failures. Anywhere you have to get off and walk is a failure. Anywhere you can't have kids ride around on their own is a failure. Anywhere that poeple don't feel is safe to walk or cycle at night is a failure. Any path that can have vans belonging to S Gloucs council parked in all day with nobody capable of dealing with the complaint about the path being blocked is a failure. Therefore we find the accusation that we are failed engineers from someone who appears to be partly involved in the process very amusing.


Why will South Gloucestershire Council not employ this idiot.

We do not seek employment, the team are all in paid employment in or residents of the area. We merely demand that the council delivers on their half of the cycling city promise. A city safe and pleasant to cycle around in. Bristol is improving. Filton, Patchway, Frenchay, well, try it and see what you think.


They have let us down. This is a shame as they have the space to do wide cycle paths, they have the congestion at peak hours to justify it, and they have the city of Bristol nearby for people to commute to and from, as well as the suburbs of Bradley Stoke and Emerson's Green.

Why are they failing us? Three options spring to mind, "the three I's"
  • Ignorance
  • Incompetence
  • Indifference

Ignorance: they don't ride bicycles themselves, they don't understand our needs. They think that large dropoffs are viable, street lights are a luxury.

Incompetence: they mean well, but something goes wrong. For example, someone could not have done a proper site survey above, included the area out the site, and nobody thought while the lovely tarmac was being laid perfectly smooth that the underlying goal was being missed. Or they think that signs will help, missing the detail that one in the middle of a path on the apex of a turn would be near-lethal. We suspect "Frank" is upset about our hints about this and is taking it personally.

Indifference: they don't really care. They assume the people on bicycles are either law-breaking criminals who don't pay road tax or stop at lights, or student underpeople from outside. Not proper revenue-earning citizens of S Gloucs. They expect us to be grateful for whatever they throw in our direction. Whereas in fact many of us work at the big technology and finance companies along here and are fed up of the treatment we receive.

Indifference is probably is the underlying root cause -except it does not (just) lie in the people doing the paths. The blame lies with the councillors. Sometimes the people on the ground are just following the orders from above, and either they aren't in a position to say "this doesn't make sense" or if they do say it, they get overruled.

We shall cover the councillor problem when we focus on Old Filton Road. We know who to blame there as they appear in the local papers, proud of what they have achieved.

It has been quite amusing reading all the comments. Now we understand why Freewheeler of Waltham Forest fame disables comments on that site -it'd be full of hate mail from every single member of the Waltham Forest council whose nominal job description involved cycle paths, transport, cycle parking, street cleaning or improving the shopping areas.

PS, Frank. The photo at the top of this page is the first one in our sequence, dated 17:06 on Feb 16. The barrier is shown as it was discovered. That was the same day that some people dug a trench in the path by the UWE entrance and then filled it in with loose gravel but didn't add tarmac. Like we say: the paths are getting worse.